Mar*_*cos 219 java days date-difference java-8 java-time
我知道有很多关于如何获得的问题,但我想要和使用新的Java 8 Date api的例子.我也知道JodaTime库,但我想要一种没有外部库的工作方式.
功能需要抱怨这些限制:
syn*_*gma 383
如果您想要逻辑日历日,请使用以下DAYS.between()方法java.time.temporal.ChronoUnit:
LocalDate dateBefore;
LocalDate dateAfter;
long daysBetween = DAYS.between(dateBefore, dateAfter);
Run Code Online (Sandbox Code Playgroud)
如果你想要24小时的文字,(持续时间),你可以使用Duration该类:
LocalDate today = LocalDate.now()
LocalDate yesterday = today.minusDays(1);
// Duration oneDay = Duration.between(today, yesterday); // throws an exception
Duration.between(today.atStartOfDay(), yesterday.atStartOfDay()).toDays() // another option
Run Code Online (Sandbox Code Playgroud)
有关更多信息,请参阅此文档(以及其他文档:Oracle的Java 8).
Sun*_*l B 113
根据VGR的评论,您可以使用以下内容:
ChronoUnit.DAYS.between(firstDate, secondDate)
Run Code Online (Sandbox Code Playgroud)
naz*_*art 34
你可以使用until():
LocalDate independenceDay = LocalDate.of(2014, Month.JULY, 4);
LocalDate christmas = LocalDate.of(2014, Month.DECEMBER, 25);
System.out.println("Until christmas: " + independenceDay.until(christmas));
System.out.println("Until christmas (with crono): " + independenceDay.until(christmas, ChronoUnit.DAYS));
Run Code Online (Sandbox Code Playgroud)
小智 10
您可以使用DAYS.between从java.time.temporal.ChronoUnit
例如
import java.time.temporal.ChronoUnit;
public long getDaysCountBetweenDates(LocalDate dateBefore, LocalDate dateAfter) {
return DAYS.between(dateBefore, dateAfter);
}
Run Code Online (Sandbox Code Playgroud)
如果starDate和endDate是java.util.Date的实例
我们可以在ChronoUnit 枚举中使用下面的between()方法
public long between(Temporal temporal1Inclusive, Temporal temporal2Exclusive) {
//..
}
Run Code Online (Sandbox Code Playgroud)
ChronoUnit.DAYS计算完成24小时的天数。
import java.time.temporal.ChronoUnit;
ChronoUnit.DAYS.between(startDate.toInstant(), endDate.toInstant());
//OR
ChronoUnit.DAYS.between(Instant.ofEpochMilli(startDate.getTime()), Instant.ofEpochMilli(endDate.getTime()));
Run Code Online (Sandbox Code Playgroud)
在枚举java.time.temporal.ChronoUnit中使用DAYS .以下是示例代码:
输出: *开始日期:2015-03-01和结束日期之间的天数:2016-03-03是==> 368.**开始日期:2016-03-03和结束日期之间的天数: 2015-03-01是==> -368*
package com.bitiknow.date;
import java.time.LocalDate;
import java.time.temporal.ChronoUnit;
/**
*
* @author pradeep
*
*/
public class LocalDateTimeTry {
public static void main(String[] args) {
// Date in String format.
String dateString = "2015-03-01";
// Converting date to Java8 Local date
LocalDate startDate = LocalDate.parse(dateString);
LocalDate endtDate = LocalDate.now();
// Range = End date - Start date
Long range = ChronoUnit.DAYS.between(startDate, endtDate);
System.out.println("Number of days between the start date : " + dateString + " and end date : " + endtDate
+ " is ==> " + range);
range = ChronoUnit.DAYS.between(endtDate, startDate);
System.out.println("Number of days between the start date : " + endtDate + " and end date : " + dateString
+ " is ==> " + range);
}
}
Run Code Online (Sandbox Code Playgroud)
小智 7
从当天获取圣诞节前的天数,试试这个
System.out.println(ChronoUnit.DAYS.between(LocalDate.now(),LocalDate.of(Year.now().getValue(), Month.DECEMBER, 25)));
Run Code Online (Sandbox Code Playgroud)
干得好:
public class DemoDate {
public static void main(String[] args) {
LocalDate today = LocalDate.now();
System.out.println("Current date: " + today);
//add 1 month to the current date
LocalDate date2 = today.plus(1, ChronoUnit.MONTHS);
System.out.println("Next month: " + date2);
// Put latest date 1st and old date 2nd in 'between' method to get -ve date difference
long daysNegative = ChronoUnit.DAYS.between(date2, today);
System.out.println("Days : "+daysNegative);
// Put old date 1st and new date 2nd in 'between' method to get +ve date difference
long datePositive = ChronoUnit.DAYS.between(today, date2);
System.out.println("Days : "+datePositive);
}
}
Run Code Online (Sandbox Code Playgroud)
每个人都说要使用ChronoUnit.DAYS.between,但只是委托给你自己称之为另一种方法.所以你也可以这样做firstDate.until(secondDate, ChronoUnit.DAYS).
两者的文档实际上都提到了这两种方法,并说使用哪一种更具可读性.
| 归档时间: |
|
| 查看次数: |
199631 次 |
| 最近记录: |